Janitor's daily report

Repair locations:

  • Switchboard disconnections
  • General piping in the boiler room
  • Wall cracks in room 304 and 305.
  • Ventilator at the front lobby
  1. Guest room repairs take priority.
Last edited by Agrias on 1 July 2008 at 11:12
This page has been accessed 468 times.